Firm: Dowling Architects
Size: 4,500 sf
Role: Lead Design Professional & Project Manager
Rehabilitation of the historic Goodspeed Block on Last Chance Gulch, including new CLT awnings and an integrated rainwater collection system.
Key Responsibilities:
Led architectural design and project management through documentation and construction-phase support.
Prepared and coordinated architectural construction documents for the historic rehabilitation.
Coordinated CLT awning design, rainwater collection integration, architectural detailing, and structural requirements.
Produced and coordinated structural drafting in collaboration with the structural engineering team.
Supported construction administration through field coordination, documentation review, and coordination with the project team.
Recognition: AIA Citation for Goodspeed Block (2023).